Product parameter
Material | Aluminum alloy |
color | Natural/various colors |
Surface treatment | Painting / powder spraying / oxidation / passivation |
Product application | Auto parts |
Weight | 469g |
Using die-casting machine | 280T |
Quality | high grade |
Casting process | high pressure die casting |
Drawing format | |
Secondary processing | machining/polishing/plating |
Main features | High mechanical strength/precise size/high air tightness/low cost/complex design structure |
Certification | |
Test | Tensile strength/salt spray |
Packing and shipping
Packing details: Bubble bag + export carton Port: FOB Port Ningbo Lead timeQuantity (number of pieces) | 1-100 | 101-1000 | 1001-10000 | >10000 |
Time (days) | 10 | 10 | 20 | 30 |
competitive advantage
- Accept small orders
- fair price
- Deliver on time
- Timely service
- We have more than 11 years of professional experience. As a manufacturer of bathroom accessories, we take quality, delivery time, cost, and risk as our core competitiveness, and all production lines can be effectively controlled
- The products we make can be your sample or your design
- We have a strong research and development team to solve the problem of bathroom hardware
- There are many supporting manufacturers around our factory
FAQ
Q: When can I get the quotation and information?
A: Our team will reply within 12 hours.
Q: How to enjoy OEM service?
A: Usually, according to your design drawings or original samples, we provide some technical suggestions
and quotes to you. We will arrange production after you confirm.
Q: Is it possible to know how my products going on without visiting your company?
A: We will offer a detailed production schedule and send weekly reports with digital pictures and videos which
show the machining progress.
Q: What are acceptable types of drawings?
A: 2D drawings: PDF, CAD, JPG, etc.
3D drawings: STP, IGS, STL, SAT, PRT, IPT, etc.
Q: How long can I have the sample?
A: Depending on your products and request, it usually takes 7-10 days.
Q: How long will you produce the parts?
A: Normally 3 weeks, we will arrange the produce schedule depends on the quantity and the delivery.